From the AGM Presentation Dec 2009
Progress was made as we put the money we eventually got from the KM to good use
� What we accomplished:
� All jetties are in good repair
� The slipway is widened
� All canal walls under our control are in good repair
� Beaches in the cove are in good repair
� Bridges are painted
� We have dredges 10,000 cubic meters
� We have planted indigenous trees on bird island and have connected taps to water them
� The spit at the mouth is being rebuilt using wind breaks
� We have already appointed a contractor for the second phase of dredging
A big thank you to Peter Grobler and his helper. Futher thanks to my committee