From the AGM Presentation Dec 2009

Progress was made as we put the money we eventually got from the KM to good use

� What we accomplished:

� All jetties are in good repair

� The slipway is widened

� All canal walls under our control are in good repair

� Beaches in the cove are in good repair

� Bridges are painted

� We have dredges 10,000 cubic meters

� We have planted indigenous trees on bird island and have connected taps to water them

� The spit at the mouth is being rebuilt using wind breaks

� We have already appointed a contractor for the second phase of dredging

A big thank you to Peter Grobler and his helper. Futher thanks to my committee